Mouse move on Image to zoom

Share with your Friends:

EDGELEC 100pcs 3mm Red Lights LED Diodes (Red Lens) Diffused Round Lens 29mm Long Lead (DC 2V) +100pcs Resistors (for DC 6-12V) Included,Bulb Lamps Light Emitting Diode

$5.99
Old price : $5.99

Edgelec Part#: ED_YW03_R2R_100Pcs 611355168569 - EDGELEC 100pcs 3mm Red Lights LED Diodes (Red Lens) Diffused Round Lens 29mm Long Lead (DC 2V) +100pcs Resistors (for DC 6-12V) Included,Bulb Lamps Light Emitting Diode


* Low Energy Consumption And Low Heat.

* Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation.

* Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F

* Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F

* Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature.

* Get other LED models? Please search "EDGELEC Diodes".

Features:

  • Product Overview: 100 pcs LED Diodes + 100 pcs Resistors
  • Product Features: Red / 3mm Diffused Round Lens / Red Lens
  • Product Parameters: 29mm Long Lead / DC 2.0V-2.2V (IF=20mA) / 0.06 Watts / 2pin / DIP LEDs
  • Product Parameters: Luminance Brighter Up To +20% / Wavelength 620nm-625nm / 120° Viewing Angle / Single LED Diodes Wight: 0.16g
  • Accessories: 100pcs 470ohm (For DC 6-12V) 1/4 Watt Metal Film Resistors Included / ±1% Tolerance

UPCs:

  • 611355168569

EAN:

  • 0611355168569
  • Manufacturer: Edgelec
  • Part Number: ED_YW03_R2R_100Pcs
  • Label: EDGELEC
  • Color: [03] Red-red / 100pcs