Mitel 12 Ft Flat Black Long Lead Handset Cord For IP 5000 Series Phones
$1.69
Old price : $1.69
Mitel Part#: Mitel-12-Foot-Long-Lead 730669097782 - Mitel 12 Ft Flat Black Long Lead Handset Cord For IP 5000 Series Phones
One end with 3 inch and and another with 2 inch flat leader.Features:
- Works with Mitel IP 5000 Series Phones (ie. 5312 5320 5320e 5324 5330 5330e 5340 5340e 5360)
- 2 FT Coiled | 12 FT Uncoiled
- one end with 3 inch and and another with 2 inch flat leader.
UPCs:
- 730669097782
EAN:
- 0730669097782
- Manufacturer: Mitel
- Part Number: Mitel-12-Foot-Long-Lead
- Model: Mitel-12-Foot-Long-Lead

Twitter
Google+
Pinterest


